SWA Connection Points Upgrade

Upgrade of Connection Points Between Production and Transmission to Meet The Requirements of the Seawater Desalination Code.

Project Name

SWA Connection Points Upgrade

Project Overview

This project involved upgrading critical connection points between production and transmission systems across seven plants to enhance reliability, operational safety, and performance continuity. The design was developed based on actual site data and aligned with the client’s reviewed project purpose and needs to finalize the required scope. High-level coordination and planning were carried out to achieve targeted performance across the seven locations.

Shutdown activities were completed within the minimum duration in compliance with plant storage tank capacity. All shutdown scenarios, including isolation valve seepages, were managed to ensure safe and timely completion. The project was successfully delivered within schedule across all sites without operational interruptions, ensuring reliable system performance and uninterrupted plant operations.