Gas Turbine Control System Installation
Gas Turbine Control System Installation (Units 12–27) – Jeddah PP3
Project Name
Gas Turbine Control System Installation
Project Overview
SAECO executed the design, supply, and installation of a comprehensive gas turbine control system for Units 12–27 at Jeddah Power Plant 3, ensuring seamless integration with existing plant infrastructure while maintaining operational continuity. Extensive performance testing and engineering validation were conducted to confirm system compatibility, reliability, and compliance with operational requirements.
Performance tests were carried out before shutdown, and reports with recommendations were shared with the customer. Detailed on-site engineering ensured the new system worked with existing units, and a plan to work on two units in parallel enabled completion before the contract end date. The project was executed successfully, with all units returned to service without issues. System upgrades achieved performance improvements, enhanced operational efficiency, and long-term reliability.
project details
Projects
- LP Bypass PLC Upgrade
- Gas Turbine System Installation
- Gas Turbine Control Replacement
- NGL & C2 Controls Upgrade
- SWA Connection Points Upgrade
- Gas Turbine Rehabilitation
- Protection Upgrade
- Excitation & Protection Upgrade
- Control & AVR Upgrade
- Protection Relay Upgrade
- Vibration Monitoring System Upgrade