Gas Turbine Rehabilitation of 9 GE Frame 5 units at Jazan Power Plant.

Project Name

Gas Turbine Rehabilitation

Project Overview

Executed the design, engineering, supply, dismantling, installation, testing, commissioning, training, and rehabilitation of nine GE Frame-5 units at Jazan Power Plant, including upgrades to control systems, generator protection relay panels, automatic voltage regulators, and replacement of defective mechanical components. The project involved comprehensive pre-shutdown assessments, close coordination with GE during the design phase, and deployment of specialized teams to minimize outage duration. Through the use of advanced technology and upgraded components, all units were successfully returned to service on schedule with improved reliability and enhanced performance.